Skip to end of banner
Go to start of banner

How do I add production phases?

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Current »

It is a system to limit the visible analysis methods at "Input sample".

Production phases are created at:

  • Production > Production Phases

Click on "Add”

Enter the description and click on "Save"

  • The analysis method must be linked to a product:

Quality control > Methods of Analysis - button "Link to product(group)".

Tab "Product group" - choose a product and click "Save".

Then at "Choose" you can select a lab

  • At Basic Data > Product > Products you can link to a production phase.

Button "Link production phases and analysis methods".

  • You can now select the production phase at Quality control > Input sample

At "Add sample" a shorter list is now visible

Note: if only one production phase has been created, it is possible that no analysis methods will be visible at Input sample. Either link the production phase to your product; or decide not to work with production phases and delete the production phase.

  • No labels