How do I add production phases?
It is a system to limit the visible analysis methods at "Input sample".
Production phases are created at:
Production > Production Phases
Click on "Add”
Enter the description and click on "Save"
The analysis method must be linked to a product:
Quality control > Methods of Analysis - button "Link to product(group)".
Tab "Product group" - choose a product and click "Save".
Then at "Choose" you can select a lab
At Basic Data > Product > Products you can link to a production phase.
Button "Link production phases and analysis methods".
You can now select the production phase at Quality control > Input sample
At "Add sample" a shorter list is now visible
Note: If production phases have already been created, you may find that analysis methods are no longer visible. In that case, link your production phase to your product.